Agricultural – Irrigation in Vegetables – Hydroponics
Date: March 2023
Customer: Mallkivitor Hydroponics
Place: Azapa Valley, Arica, Chile
Duration: 1 year
Results: Increased profitability, organoleptic characteristics and decreased use of fungicide.
Weight and length of roots.
Industrial – Wastewater treatment
Date: July 2023
Customer: Important pulp company
Lugar: Chile
Duration: 7 days
Results: Decrease in total nitrogen, decrease in total phosphorus, improve quality of industrial wastewater.
Aquaculture – Production improvements in the Salmon laboratory
Date: November 2023
Client: Naturisa
Place: Ecuador
Duration: 90 days
Benefits: Elimination of chemicals and reduction of time to prepare pond water prior to planting.
prior to planting. Increased shrimp growth rate.
Industrial – Hygiene and sanitation
Chemical Reduction
Date: 2023
Customer: Salmon industry
Location: Chile
Duration: 2 months
Results: 70% less disinfectants, 50% less detergent.
Agricultural – Irrigation of fruit
trees Cherry trees
Date: December 2022
Company: EcoFresh
Location: Región del Maule, Chile
Duration: October– March (182 days)
Results: Increase in caliber, fruit weight and firmness.
Industrial – Hygiene Chemical Disinfection
Abatement
Date: 2022
Customer: Salmon industry
Place: Quellón, Chile
Duration: 21 days
Results: 70% less chemicals, 40% less time (increased productivity).
Industrial – Wastewater Treatment Aeration in biological reactor
Date: October 2022
Customer: AB-InBev Chile Brewery
Place: Quilicura, Chile
Duration: Greater efficiency in removal of organic load, reduction in energy consumption, greater efficiency in aeration.
Agricultural – Irrigation of fruit trees: Increase in apple size
Date: Season 2021 – 2022
Enterprise: Apple Producer
Place: Longaví, Maule Region, Chile
Duration: 6 months
Results: An increase of 16.7% in yield per hectare, 18% in weight per fruit. 66% more fruit concentrated in the larger sizes (70, 80, 90 size) than fruit irrigated without NB
Agricultural – Urban Park Irrigation
Date: Season 2021 – 2022
Customer: Municipality of Vitacura
Place: Bicentennial Park, Vitacura, Metropolitan Region
Duration: 90 days
Results: Reduction of irrigation water by 50%.
Industrial – Wastewater Treatment
Aeration secondary treatment: Biodiscs
Date: March 2022
Customer: Important food company in the country
Place: Osorno, Los Lagos Region
Duration: 1 month trial, currentlywith permanent installation
Results: Increase and stability in the oxygen level in the medium, filament control, operational improvements.
Agricultural – Algae Control in Irrigation Dams
Date: February 2022
Enterprise: Monteoscuro
Place: San Pedro, Región Metropolitana, Chile
Duration: 3 months
Results: Control of algae blooms in the irrigation dam, completely eliminating the use of copper sulphate as an algaecide. Less algae present and better water quality that led to a decrease in the frequency of cleaning and changing filters.
Agricultural – Odor Control Water Reuse for Irrigation
Date: November 2021
Enterprise: Frutexsa
Place: Buin, Metropolitan Region, Chile
Duration: 32 days
Results: Control of odor emanation, increase of DO and ORP in irrigation dam.
Agricultural – Lettuce Production
Date: November 2021
Enterprise: Frutexsa
Place: Buin, Metropolitan Region, Chile
Duration: 32 days
Results: Control of odor emanation, increase of DO and ORP in irrigation dam.
Industrial – Wastewater Treatment
Primary treatment: Sedimentator
Date: December 2021
Customer: Frutexsa
Place: Buin, Metropolitan Region
Duration: 1 month
Results: reduction of 26% of total suspended solids (TSS) and 14% of organic matter (COD).
Industrial – Wastewater Treatment
Primary treatment: DAF
Fecha: Julio 2021
Cliente: Importante empresa productora de proteína animal
Lugar: Región de Valparaíso
Duración: 30 días
Resultados: Aumento en un 2,7% en la eficiencia de remoción de materia orgánica disminuyendo en 23,7% de DQO, efecto buffer.
Agricultural – Sanitization of sausage process
Date: July 2021
Location: Chile
Duration: 1 day
Results: Reduction of up to 75% of the presence of listeria in sausage transport carts.
Industrial – Wastewater Treatment
Lakeremediation
Date: June 2021
Place: Amatitlán, Guatemala
Duration: 8 days
Results: Eradication of eutrophic algae, control of microcystis aeruginosa.
Aquaculture – Shrimp
Date: April 2021
Company: Rivermar
Location: Choluteca, Honduras
Duration: 30 days
Results: Survival improvement of 163% over the traditional syste
Agricultural – Control of Pseudomonas in nurseries
Date: March 2021
Place: Hijuelas, Quillota Province
Duration: 8 days
Results: 47% less presence of Pseudomonas than commercial control and considerable decrease in severity.
Industrial – Wastewater Treatment
Aeration primarytreatment: Equalizer
Date: December 2019
Company: Cedro Textil
Place: Metropolitan Region
Duration: 2 days
Results: 61% higher level of available oxygen concentrated in the equalizer, greater permanence of oxygen in the medium over time.
Industrial – Wastewater Treatment
Primary treatment: DAF
Date: August 2019
Client: Egg product company
Place: Macul, Metropolitan Region
Duration: 3 days
Results: Chemical savings, 25% reduction of flocculant (polymer) and 40% of coagulant (ferric chloride).
Industrial – Industrial Cleaning
Container washing
Date: October 2022
Customer: Important animal protein producer
Place: Chile
Duration: 1 day
Results: Control of Biofilms, reduction of microbiologicalload, shorter cleaning time,optimization of man hours.
Do you want to know more about the world of nanobubbles?