INDUSTRIAL

EFFICIENCY HENERGY AND ENERGY
DECREASE IN THE USE OF CHEMICALS
CONTROL OF MICROORGANISMS
SAVING CLEANING TIME

INCREASED REMOVAL



IN WASTE WATER

WE INVITE YOU TO CHECK OUT OUR APPLICATIONS

SURFACE CLEANING

PRIMARY TREATMENT

SECONDARY TREATMENT

INDUSTRIAL CLEANING

ODOR CONTROL

In Kran’s industrial division, we implement tailor-made solutions using nanobubble technology for the different stages of production processes where the use of water is critical. We are present in different industries such as beverages and fermented foods, dairy, salmon, meat and sanitary, throughout the entire chain, from solutions in the cleaning or hygiene of equipment and surfaces (CIP, COP, washing machines, etc.), to the treatment of process water (PTRs), with the aim of reducing water and energy consumption, reducing the use of chemicals, odors and improve the removal of contaminants.

Our nanobubble generators are manufactured in Chile and are operated as an add-on to the existing system thanks to their modular nature and small footprint.

Thanks to the properties of nanobubbles, we are able to solve various problems and challenges on an industrial scale, contributing to the challenges in terms of production, as well as sustainability and the environment of our customers.

OUR EXPERIENCES

Industrial – Wastewater

TreatmentDecreasein totalN and P

Date: July 2023
Customer: Major pulp company
Location: Chile
Duration: 7 days
Results: Decrease intotal nitrogen,decrease intotal nitrogen,improve industrial wastewater quality
DOWNLOAD

Industrial – Hygiene & SanitizationChemical
Reduction

Date: 2023
Customer: Salmon industry
Location: Chile
Duration: 2 months
Results: 70% less disinfectants, 50% less detergent.
DOWNLOAD

Industrial – Hygiene & SanitizationTime
reduction

Date: 2022
Customer: Salmon industry
Place: Quellón, Chile
Duration: 21 days
Results: 70% less chemicals, 40% less time (increased productivity).
DOWNLOAD

Industrial – Wastewater

TreatmentAeration ina biological reactor

Date: October 2022
Customer: AB-InBev Chile Brewery
Place: Quilicura, Chile
Duration: Increased efficiency in organic load removal, decreased energy consumption, greater efficiency in aeration.
DOWNLOAD

Industrial – Industrial
Cleaning
Container washing

Date: October 2022
Customer: Important animal protein producer
Place: San Vicente de Tagua-Tagua
Duration: 1 day
Results: Biofilm control, reduction of microbiologicalload, shorter cleaning time,optimization of man-hours.
DOWNLOAD

Industrial – Wastewater
Treatment
Aerationsecondarytreatment: Biodiscs

Date: March 2022
Customer: Important food company in the country
Place: Osorno, Los Lagos Region
Duration: 1 month trial, currently permanently installed
Results: Increase and stability in the oxygen level in the medium, filament control, operational improvements.
DOWNLOAD

Industrial – Wastewater
Treatment
Primary Treatment: Settler

Date: December 2021
Customer: Frutexsa
Place: Buin, Metropolitan Region
Duration: 1 month
Results: 26% reduction in total suspended solids (TSS) and 14% reduction in organic matter (COD).
DOWNLOAD

Industrial – Wastewater
Treatment
Aeration SecondaryTreatment: Biological Reactor

Date: August 2021
Customer: Important animal protein producer
Place: Valparaiso Region
Duration: 1 day
Results: Increased efficiency in the level ofoxygenation in the medium.
DOWNLOAD

Industrial – Wastewater
Treatment
Primary treatment: DAF

Date: July 2021
Customer: Important animal protein producer
Place: Valparaiso Region
Duration: 30 days
Results: A 2.7% increase in the efficiencyof organic matterremoval,with a 23.7% decrease in COD, buffer effect.
DOWNLOAD

Industrial – Wastewater
Treatment
Lagoonremediation

Date: June 2021
Place: Amatitlán, Guatemala
Duration: 8 days
Results: Eradication of eutrophic algae, control of microcystis aeruginosa.
DOWNLOAD

Industrial – Wastewater
Treatment
AerationPrimaryTreatment: Equalizer

Date: December 2019
Enterprise: Textile Cedar
Place: Metropolitan Region
Duration: 2 days
Results: 61% higher level of available oxygen concentrated in the equalizer, greater permanence of oxygen in the medium over time.
DOWNLOAD

Industrial – Wastewater
Treatment
Primary treatment: DAF

Date: August 2019
Client: Egg Products Company
Place: Macul, Metropolitan Region
Duration: 3 days
Results: Chemical savings, 25% reduction in flocculant (polymer) and 40% coagulant (ferric chloride).
DOWNLOAD

TEAM

Alejandro Hernandez

Deputy Manager Industrial Division

Francisca Olivares

Industrial Project Manager

Leslie Muñoz

Industrial Project Manager

Ignacio Coronado

Industrial Project Manager

Yaritsa Palomino

Industrial Project Engineer

Do you want to know more about the world of nanobubbles?

contact us at