Industrial – Hygiene & SanitizationChemical
Reduction

Date: 2023
Customer: Salmon industry
Location: Chile
Duration: 2 months
Results: 70% less disinfectants, 50% less detergent.
DOWNLOAD

Agricultural – Irrigation of Cherry Orchards

Date: December 2022
Enterprise: EcoFresh
Place: Maule Region, Chile
Duration: October – March (182 days)
Results: Increased size, fruit weight and firmness.
DOWNLOAD

Industrial – Hygiene & SanitizationTime
reduction

Date: 2022
Customer: Salmon industry
Place: Quellón, Chile
Duration: 21 days
Results: 70% less chemicals, 40% less time (increased productivity).
DOWNLOAD

Industrial – Wastewater

TreatmentAeration ina biological reactor

Date: October 2022
Customer: AB-InBev Chile Brewery
Place: Quilicura, Chile
Duration: Increased efficiency in organic load removal, decreased energy consumption, greater efficiency in aeration.
DOWNLOAD

Industrial – Industrial Cleaning

Container washing

Date: October 2022
Customer: Important animal protein producer
Place: San Vicente de Tagua-Tagua
Duration: 1 day
Results: Biofilm control, reduction of microbiologicalload, shorter cleaning time,optimization of man-hours.
DOWNLOAD

Agricultural – Irrigation of fruit trees: Increase in apple size

Date: Season 2021 – 2022
Enterprise: Apple Grower
Place: Longaví, Maule Region, Chile
Duration: 6 months
Results: Increase of 16.7% in yield per hectare, 18% in weight per fruit. 66% more fruit concentrated in the larger sizes (70, 80, 90 size) than fruit irrigated without NB
DOWNLOAD

Agricultural – Urban Park Irrigation

Date: Season 2021 – 2022
Customer: Municipality of Vitacura
Place: Bicentennial Park, Vitacura, Metropolitan Region
Duration: 90 days
Results: 50% decrease in irrigation water.
DOWNLOAD

Industrial – Wastewater
Treatment
Aerationsecondarytreatment: Biodiscs

Date: March 2022
Customer: Important food company in the country
Place: Osorno, Los Lagos Region
Duration: 1 month trial, currently permanently installed
Results: Increase and stability in the oxygen level in the medium, filament control, operational improvements.
DOWNLOAD

Agricultural – Algae Control in Irrigation Dams

Date: February 2022
Enterprise: Monteoscuro
Place: San Pedro, Metropolitan Region, Chile
Duration: 3 months
Results: Control of algae blooms in the irrigation dam, completely eliminating the use of copper sulfate as an algaecide. Less algae present and better water quality that led to a decrease in the frequency of cleaning and changing filters.
DOWNLOAD

Agricultural – Odor Control & Water Reuse for Irrigation

Date: November 2021
Enterprise: Frutexsa
Place: Buin, Metropolitan Region, Chile
Duration: 32 days
Results: Control of odour emanation, increase of DO and ORP in irrigation dams.
DOWNLOAD

Agricultural – Lettuce Production

Date: November 2021
Enterprise: Frutexsa
Place: Buin, Metropolitan Region, Chile
Duration: 32 days
Results: Control of odour emanation, increase of DO and ORP in irrigation dams.
DOWNLOAD

Industrial – Wastewater
Treatment
Primary Treatment: Settler

Date: December 2021
Customer: Frutexsa
Place: Buin, Metropolitan Region
Duration: 1 month
Results: 26% reduction in total suspended solids (TSS) and 14% reduction in organic matter (COD).
DOWNLOAD

Industrial – Wastewater
Treatment
Aeration SecondaryTreatment: Biological Reactor

Date: August 2021
Customer: Important animal protein producer
Place: Valparaiso Region
Duration: 1 day
Results: Increased efficiency in the level ofoxygenation in the medium.
DOWNLOAD

Industrial – Wastewater
Treatment
Primary treatment: DAF

Date: July 2021
Customer: Important animal protein producer
Place: Valparaiso Region
Duration: 30 days
Results: A 2.7% increase in the efficiencyof organic matterremoval,with a 23.7% decrease in COD, buffer effect.
DOWNLOAD

Agricultural – Sanitization of sausage process

Date: July 2021
Place: Chile
Duration: 1 day
Results: Up to 75% reduction in the presence of listeria in sausage transport carts.
DOWNLOAD

Aquaculture – Seabed Recovery (FONSA)

Date: June 2021
Enterprise: Salmon
Place: Aysen
Duration: 22 days
Results: Aerobic fitness recovery from a category 4 center.
DOWNLOAD

Industrial – Wastewater
Treatment
Lagoonremediation

Date: June 2021
Place: Amatitlán, Guatemala
Duration: 8 days
Results: Eradication of eutrophic algae, control of microcystis aeruginosa.
DOWNLOAD

Agricultural – Increased shelf life

Date: May 2021
Enterprise: Crispagold
Place: RM
Duration: 30 days
Results: Increased shelf life of the fruit up to 8 weeks, extending the quality and condition for export.
DOWNLOAD

Aquaculture – Process Water

Date: May 2021
Enterprise: Cooke Aquaculture
Place: Tepual
Duration: 21 days
Results: Reduction of microbiological load, reduction of degradation in the raw material processed in secondary plants.
DOWNLOAD

Aquaculture – Shrimp

Date: April 2021
Enterprise: River Mar
Place: Choltueca, Honduras
Duration: 30 days
Results: Survival improvement by 162.96% over the traditional system.
DOWNLOAD

Agricultural – Control of Pseudomonas in nurseries

Date: March 2021
Place: Hijuelas, Quillota Province
Duration: 8 days
Results: 47% less presence of Pseudomonas than the commercial control and considerable decrease in severity.
DOWNLOAD

Aquaculture – Flow ice

Date: March 2021
Enterprise: Cooke Aquaculture
Place: Quellón
Duration: 22 days
Results: Increased shelf life by 5 days, decreased microbiological load, decreased degradation by oxidation, decreased odors. Quality maintenance.
DOWNLOAD

Aquaculture – Flake Ice

Date: March 2021
Enterprise: Cooke Aquaculture
Place: Tepual
Duration: 15 days
Results: Useful life of flake ice for HON format, maintaining its shape characteristics and improving its physical qualities (heat).
DOWNLOAD

Aquaculture – Seabed Recovery (FONSA)

Date: October 2020
Enterprise: Salmon
Place: Magallanes Region
Duration: 38 days
Results: Category 4 Center Aerobic Fitness Recovery.
DOWNLOAD

Industrial – Wastewater
Treatment
AerationPrimaryTreatment: Equalizer

Date: December 2019
Enterprise: Textile Cedar
Place: Metropolitan Region
Duration: 2 days
Results: 61% higher level of available oxygen concentrated in the equalizer, greater permanence of oxygen in the medium over time.
DOWNLOAD

Industrial – Wastewater
Treatment
Primary treatment: DAF

Date: August 2019
Client: Egg Products Company
Place: Macul, Metropolitan Region
Duration: 3 days
Results: Chemical savings, 25% reduction in flocculant (polymer) and 40% coagulant (ferric chloride).
DOWNLOAD

Agricultural – Sooty Mold Control

Date: May 2017
Enterprise: Crispagold
Place: RM
Duration: 30 days
Results: Reduction of sooty mold up to 50%, increasing the percentage of exportable fruit.